AFIR
Alternative Fuels Infrastructure Regulation
Binding EU targets for public EV charging and hydrogen refuelling: fleet-based kW per vehicle, fast-charging pools every 60 km on core TEN-T roads, and card payment with per-kWh price transparency.
Last updated
Regulation (EU) 2023/1804 (AFIR), applicable since 13 April 2024, replaced Directive 2014/94/EU with directly binding deployment obligations on Member States, removing the discretion the old directive allowed.
What it requires
- Fleet-based charging: at least 1.3 kW of publicly accessible charging power per registered battery-electric light-duty vehicle, and 0.80 kW per plug-in hybrid (Article 3).
- Core TEN-T road network (light-duty): recharging pools at most 60 km apart, each at least 400 kW by end 2025, rising to 600 kW by end 2027.
- Heavy-duty vehicles: core-network pools phased to at least 1,400 kW (end 2025), 2,800 kW (end 2027) and 3,600 kW with 60 km spacing (end 2030).
- Hydrogen: refuelling stations (minimum 1 tonne/day, 700 bar) at most 200 km apart on the core TEN-T network by end 2030 (Article 19).
- Payment and transparency: operators must allow ad-hoc charging with no subscription; stations of 50 kW and above must accept card or contactless payment and display the ad-hoc price per kWh before the session (Article 5).
Why it matters for the EV market
AFIR converts charging rollout from a market gamble into a legal obligation, creating sustained demand for charge-point operators, grid-connection engineers, e-mobility roaming and payment specialists, and Member State infrastructure planners reporting against the national policy frameworks. Source: EUR-Lex.
Who it applies to
EU Member States (bound by deployment targets) and operators of publicly accessible recharging and hydrogen refuelling points; excludes private and employee-only infrastructure.
Key dates
- 2023-10-12
- Entry into force
- 2024-04-13
- Date of application
- 2025-12-31
- Core TEN-T light-duty pools (400 kW per pool, every 60 km); first HDV charging phase
- 2027-12-31
- Core TEN-T light-duty pools rise to 600 kW
- 2030-12-31
- HDV core network complete (3,600 kW pools); hydrogen every 200 km on core TEN-T